Our company is set to initiate early production in the Block-9 Contract area, situated in Basra Governorate, Southern Iraq. This endeavor involves transporting produced crude oil via road tankers from the Block-9 Contract Area to be offloaded and conveyed to the South Oil Company (SOC) in the Nahar Bin Umar oil field.
The proposed Offloading Station will be strategically positioned 150 meters off the Basra-Misan highway (Highway No. 6), near SOC's Nahar Bin Umar Degassing Station. Here, the offloaded crude oil will be efficiently pumped to SOC's Nahar Bin Umar Degassing Station by tapping into an existing 10” buried pipeline connected to the Crude Oil Tanks at the Degassing Station.Furthermore, our HDPE solutions boast the industry's best quality control and quality assurance testing capabilities, providing unmatched peace of mind for project stakeholders. Rest assured, with our expertise and commitment to excellence, your lining project is in capable hands."